Watch the progress as we build the new library
Check back often,we will try to add new photos as it happens
- Coming 2017
- 8.10.16 Footings poured today
- 8.12.16 Working in Drizzle
- 8.16.16 All sides of the foundation walls are visible above ground now.
- The new drive up drop box.
- 9.22.16
- 9.23.16
- 1.10.17 Childrens Playroom
- Our future fireplace
- Looking towards the Teen areato the left and Fireplace
- Circulation Desk
- Inside the entrance looking out the toward the front doors
- Main Area of the Library
- Teen Area
- Computer/Classroom
- Community Room Entrance